MIL-PRF-52747F(AT)
4.2 First article inspection.
4.2.1 Examination. Unless otherwise specified (see 6.2), two first article nozzle
assemblies shall be examined as specified in 4.4.2 (see table I). Presence of one or more defects
shall be cause for rejection.
4.2.2 Tests. Each nozzle shall be subjected to the tests marked "X" in the first article
columns of table II. Failure of any test shall be cause for rejection. Unless otherwise specified
(see 6.2), the Government reserves the right to perform first article testing on three or more
nozzle assemblies. The tests shall consist of any of the tests in table II which the Government
desires to perform.
4.3 Conformance inspection.
4.3.1 Sampling. Sampling for examination and test shall be in accordance with
ANSI/ASQC Z1.4, inspection level II. Sample size shall be determined by table I and table IIA.
A lot shall be accepted when zero defects are found, and rejected when one or more defects are
found.
4.3.2 Examination. Each nozzle shall be examined for the defects specified in 4.4.2.
Presence of one or more defects shall be cause for rejection.
4.3.3 Tests. Samples selected in accordance with 4.3.2 shall be subjected to the tests
marked "X" in the conformance column of table II. Failure of any test shall be cause for
rejection.
4.4. Method of inspection.
4.4.1 Material. Conformance to 3.2 shall be determined by inspection of contractor
records providing proof or certification that materials conform to requirements. Applicable
records shall include drawings, specifications, design data, receiving inspection records,
processing and quality control standards, vendor catalogs and certifications, industry standards,
test reports, and rating data.