MIL-PRF-81380E
processing provided a risk assessment determines the changes will have negligible impact on
element or system performance.
4.3 Conformance inspection.
4.3.1 Conformance inspection for elements. Conformance inspection for elements shall
consist of the tests shown in table V. These inspections shall be performed on those samples
selected from an inspection lot in accordance with ASQ-Z1.4, general inspection level II. An
inspection lot shall consist of all elements of the same size produced under the same conditions
and offered for inspection at one time.
Table V. Group A conformance inspection for elements.
Requirement
Inspection
Paragraph
Method
-
-
Examination
Materials
3.2
visual inspection
Workmanship
3.7
visual inspection
4.3.2 Conformance inspection for filter/monitor housings. Each filter/monitor housing
selected shall be subjected to the examinations and tests shown in table VI.
Table VI. Conformance inspection for filter/monitor housings.
Requirement
Method
Inspection
Paragraph
Paragraph
-
-
Examination
Materials
3.2
4.5.1
Element configuration and flow rate
3.3
4.5.1
Housing configuration
3.4.1
4.5.1
Piping connections
3.4.2
4.5.1
Accessory connections
3.4.3
4.5.1
Drain valve
3.4.4
4.5.1
Pressure gage
3.4.5
4.5.1
Pressure rating
3.4.6
4.5.1
Identification
3.6
4.5.1
Workmanship
3.7
4.5.1
-
-
Performance test
Hydrostatic pressure test
3.5.1
4.5.2.1
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business