MIL-PRF-81380E
Table II. Filter/monitor element qualification testing.
Requirement
Method
Inspection
Paragraph
Paragraph
-
-
Examination
Materials
3.2
4.5.1
Element configuration and flow rate
3.3
4.5.1
Workmanship
3.7
4.5.1
-
-
Performance, environmental, and post-environmental tests
Structural integrity, media migration, and differential
3.5.2, 3.5.3, 3.5.4
4.5.2.2
pressure test
Solids reaction and mechanical integrity test
3.5.5, 3.5.6
4.5.2.3
Water and surge reaction test
3.5.7, 3.5.8
4.5.2.4
Reaction to slugs test
3.5.9
4.5.2.4
Water immersion test
3.5.9
4.5.2.5
Freezing/thawing test
3.5.10
4.5.2.6
Performance after extended flow test
3.5.11
4.5.2.7
High temperature test
3.5.12.1
4.5.3.1
Low temperature test
3.5.12.2
4.5.3.2
Fuel immersion test
3.5.12.3
4.5.3.3
Post-environmental water reaction test
3.5.13
4.5.5
Table III. Supplemental filter/monitor element qualification testing.
Requirement
Method
Inspection
Paragraph
Paragraph
-
-
Examination
Materials
3.2
4.5.1
Element configuration and flow rate
3.3
4.5.1
Workmanship
3.7
4.5.1
-
-
Performance tests
Differential pressure portion of the structural integrity,
3.5.4
4.5.2.2
media migration, and differential pressure test
Water reaction portion (test condition 1 of
3.5.7
4.5.2.4
table I only) of the water and surge reaction test
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business